Automatic Drawstring Garbage Bag on Roll Bag Making Machine Polythene Bag Making Machine
Overview Company Profile Silstar machinery founded in 1997, we focused on film blowing machine, bag making machines for
Basic Info
Model NO. | GBBCR-900-INTERLEAVE |
Continuous-Rolled | Yes |
Sealing & Cutting | Hot Seal Perforation |
Layer | Double |
Machine Type | Bag Forming Machine |
Computerized | Computerized |
Type | Plastic Bag Making Machine |
Bag Making Methods | Rolling Bag |
Bag Making Length | 100-1000mm |
The Kinds of Bag Making | Color Printing Bag; White Bag |
Dimension of The Machine | 11500*2100*2200mm |
Bag Making Width | 300-850mm |
Total Power | 18kw |
Machine Inverter Brand | Made in China |
After-Sale Service Provided | Engineers Available to Service Machinery Overseas |
Function | Non-Snap Bag on Roll |
Transport Package | Wrapping Film Packing or Packed in Wooden Case |
Specification | CE, ISO9001: 2008, SGS, TUV |
Trademark | SILSTAR |
Origin | Made in China |
HS Code | 84778000 |
Product Description
Company Profile
Silstar machinery founded in 1997, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. Our products including:1.Plastic T-shirt Bag Making Machine2.Vegetable Bag on Roll Making Machine With Core3.Garbage Bag Making Machine Coreless4.Draw Tape Garbage Bag on Roll Making Machine5.Plastic Film Blowing MachineThere are more than 54 countries and regions cooperating with us, such as Malaysia, Russia, Iran, Saudi Arabia, Peru, Algeria, Vietnam, India, Romania, America, etc.Product Description
1. Main control panel adopts touch screen Delta from Taiwan, high definition2. The drive system of the whole machine adopts PLC Microcomputer control (Single Chip control system ) on the punch machine which integrates control of bag making part and punching part.3. Set all functions with one touch screen, simple and easy operation.4. Machine will automatically stop if film jammed which is detected by the sensor5. Independent winder part, high efficient unwind control; max diameter of single unwinding is 800mm; unwinding roller is choked by air shaft,6. Automatic fold function and put on conveyor unit by unit.7. Automatic stacks the bag and collects.8. When the bags stack at the Set numerical, mechanical hands will automatically grab bags and the machine will not stop.) on punch machine which integrates control of bag making part and punching part.Product Parameters
Bag Width | 1000 mm |
Bag Length | 900 mm |
Film thickness | 10-50 µm per layer |
Unwinder Film Size | 1000mm x Φ 600mm |
Bag making Speed | 150 m/min |
Roll Change Speed | Max. 10 pcs |
Width of Draw Tape | 100 mm |
Draw Tape Roll Diameter | 600 mm |
Roll Width | 300 mm |
Roll Diameter | Φ 150 mm |
Total Power | 25 KW |
Air consumption | 5HP |
Machine Weight | 3800KG |
Machine Dimension | L15000*W2000*H2100 mm |
Detailed Photos
Certifications
Packaging & Shipping
Exhibition
FAQ
1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |
Send to us