Overseas Engineering Team Technical Support 150PCS/Min-280PCS/Min Production Speed Paper Bag Making Machine
Basic Info
Model NO. | MEW WORLD B |
After-sales Service | Overseas Engineering Team Technical Support |
Warranty | 1 Year |
Machine Type | Bag Forming Machine |
Bag Type | Shopping Bag |
Characteristic | Automatic Glue |
Computerized | Computerized |
Speed | 150PCS/Min-280PCS/Min |
Width | 80-560mm |
Size and Shape | 13000*2600*2000mm |
Long | 190-770mm |
Weight | 13000kg |
Material | Paper |
Usage | Shopping Bag, Garment Bag, Leisure Food Bag, Bread Bags, Airsickness Bag, Fruit Bag |
Max.Paper Roll Diameter | 290-1670mm |
Total Power | 27kw |
Bottom Width | 80-560mm |
Paper GSM | 45-150GSM |
Transport Package | Wooden Packing |
Specification | 9500*2600*1900mm |
Trademark | Ounuo |
Origin | China |
HS Code | 8441200000 |
Production Capacity | 200PCS/Min |
Packaging & Delivery
Package size per unit product 1300.00cm * 260.00cm * 200.00cm Gross weight per unit product 13000.000kgProduct Description
OYANG-16 NEW WORLD B SERIES Semi-automatic Roll-fed Paper Bag Machine(Without Handle)This machine is designed to manufacture square bottom paper bags without handles from paper roll,and it is an ideal equipment for producing producing various sized paper bags fast. By implementing steps including paper feeding,tube forming,tube cutting and bottom forming online,this machine can effectively save labor costs. The equipped photoelectric detector can correct cutting length,so as to ensure cutting precision. This machine can process very thin paper,as well as produce paper bags very fast,thus this machine is especially suitable for being applied in food industries.Product Parameters
MAIN PARAMETERS
Model | New World B220 | New World B330 | New World B 400 | New World B 450 | New World B 460 | New World B560 |
Paper bag length | 190−430mm | 280-530mm | 280-600mm | 280-600mm | 320-770mm | 320-770mm |
Paper bag width | 80-220mm | 150-330mm | 150-400mm | 150-450mm | 220-460mm | 280-560mm |
Paper bag bottom width | 50-120mm | 70-180mm | 90-200mm | 90-200mm | 90-260mm | 90-260mm |
Paper thickness | 45-150g | 60-150g | 70-150g | 70-150g | 70-150g | 80−150g |
Machine Speed | 280pcs/min | 220pcs/min | 200pcs/min | 200pcs/min | 150pcs/min | 150pcs/min |
Paper roll width | 290-710mm | 470-1050mm | 510-1230mm | 510-1230mm | 650-1470mm | 770-1670mm |
Roll paper diameter | ≤1500mm | ≤1500mm | 1300mm | ≤1500mm | ≤1500mm | ≤1500mm |
Machine powerMachine weight | 34380V 15kw5600kg | 34380V8kw8000kg | 34380V15.5kw9000kg | 34380V 15.5kw9000kg | 34380V 25kw12000kg | 34380V 27kw13000kg |
Machine size | L8.6×W2.6×H1.9M | L9.5×W2.6×H1.9M | L10.7×W2.6×H1.9M | L10.7×W2.6×H1.9M | L12×W4×H2M | L13×W2.6×H2M |
1.Save land area2.High production efficiency3.Stable machine operation4.Wide range of bag making dimensions
Company ProfileFounded in 2006,covering an area of 130,000 square meter, more than 400 workers, Zhejiang Ounuo Machinery Co,.Ltd is a comprehensive company, we are the biggest paper bag machine & nonwoven bag making machine manufacturer in China. we offer complete solutions to customer in the eco-friendly bag making project,including paper bag making solutions, nonwoven bag making solutions,nonwoven fabric production line, we had exported them to all over the world in the past years. Every year we have at least one new design machine.Creating value for customers first is the only way to achieve self-worth. We look forward to cooperate with you!
FAQ
Q1. How long will your engineer reach our factory?Our After-sales Specialist would contact you to confirm the final scheduling according to your reasonable request.Q2. How many days will you finish installing?We will finish installation and training within 1-2 weeks.Q3. What should we charge for your engineer?You should charge for the cost of our engineer's visa, air tickets,SIM card, hotel, food, and also their salary 150USD one day per person.Q4. How long is your machine's warranty period?All our machine have one year guarantee, starting from finished installation.
Q5. How could we do if the parts broken within warranty?We would express the free replacement parts during the warranty date.Q6. Does your engineer speak English?Our engineers understand a little English. All of our engineers have more than five years machine installation experience.
Q7. How do we solve the machine problem after your engineer leaving?Generally speaking, there will be no problem after finish installing. In case any problem, you can contact our after sales specialist at any time. There are 30 engineers at our after-sales department with 30 engineers and they'll take solution videos according your description.