Fully Automatic Plastic Poly Biodegradable PE HDPE LDPE Continuous Drawstring Garbage Bag Making Machine Rolling Draw Tape Garbage Bag on Roll Machine
HomeHome > Products > Bag Making Machine > Fully Automatic Plastic Poly Biodegradable PE HDPE LDPE Continuous Drawstring Garbage Bag Making Machine Rolling Draw Tape Garbage Bag on Roll Machine
Fully Automatic Plastic Poly Biodegradable PE HDPE LDPE Continuous Drawstring Garbage Bag Making Machine Rolling Draw Tape Garbage Bag on Roll Machine

Fully Automatic Plastic Poly Biodegradable PE HDPE LDPE Continuous Drawstring Garbage Bag Making Machine Rolling Draw Tape Garbage Bag on Roll Machine

Overview Product Description Silstar's automatic drawstring bag making machine are using the newly designed and stable r
Basic Info
Model NO. GBBCR-1200
Warranty 1 Year
Lines 1
Voltage 220V/380V
Speed High
Continuous-Rolled Yes
Sealing & Cutting Hot Seal Perforation
Layer Double
Machine Type Bag Making Machine
Computerized Computerized
Type Plastic Bag Making Machine
After-Sale Service Provided Engineers Available to Service Machinery Overseas
Temperature Controller Made in Taiwan
Material HDPE,LDPE
Guarantee One Year
Machine Brand Silstar
Machine Inverter Brand Made in Taiwan
Servo Motor Made in Taiwan
Machine Control Computer Box
Transport Package Wrapping Film Packing or Packed in Wooden Case
Specification CE, ISO9001: 2008, SGS, TUV
Trademark SILSTAR
Origin Jiangyin City Jiangsu Province
HS Code 84778000
Product Description

Product Description

Silstar's automatic drawstring bag making machine are using the newly designed and stable rolling system which can release you from the manual rolling mode, improve the production efficiency remarkably. Automatic draw string bag making machine is able to produce HDPE,LDPE draw string/draw tape bags. Due to the photocell being equipped on the machine, it makes the machine can easily handle both printed bags and white bags. By increasing of raw material cost these years, many plastic bag makers are adding recycle material or Caco3 into granules, which causes the film to be harder to seal. While Silstar's seal knife is could seal the film which is mixed with recycled material and CaCO3 firmly.

Product Parameters

ItemsGBBCR-800GBBCR-1000GBBCR-1200
LinesOne deck, one lineOne deck, one lineOne deck, one line
Bag width300-600mm300-850mm500-1000mm
Bag length120-700mm120-900mm120-1000mm
Bag thickness0.006-0.035mm0.006-0.035mm0.006-0.035mm
Output one100-120pcs/min100-120pcs/min100-120pcs/min
Total Power12kw13kw14kw
Model nameRolling draw tape bag making machine
Final productDraw tape bag
ApplicationDraw tape bag,printed or unprinted draw tape garbage bag
MaterialHDPE,LDPE,Recycled material,CACO3 added
Bag length120-1000mm
Bag width50-1000mm
Output50-120pcs/min
Unwinder wayMotor driver control
ServoTaiwan TECO *2
InverterTaiwan TECO
Air cylinderTaiwan AirTAC
Delivery time30-60 days
Warranty1 year
Technical AssistanceEngineers are avilable service machine oversea
Optional deviceAutomatic paper core change device

Detailed Photos


Main products:

Company Profile

Silstar machinery founded in 1997, covers an area of 32,000 m2, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.
SILSTAR Workshop Pictures:

Certifications

Packaging & Shipping

Fully Automatic Plastic Poly Biodegradable PE HDPE LDPE Continuous Drawstring Garbage Bag Making Machine Rolling Draw Tape Garbage Bag on Roll Machine

Exhibition

Fully Automatic Plastic Poly Biodegradable PE HDPE LDPE Continuous Drawstring Garbage Bag Making Machine Rolling Draw Tape Garbage Bag on Roll Machine

FAQ
1.
Q: How long will your engineer reach our factory?
A: Within 7-15 days after the machine arrives at your factory.
2.
Q: How many days will you finish installing?
A: We will finish installation and training within 3-7 days.
3.
Q: What should we charge for your engineer?
A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person.
4.
Q: How long is your machine's warranty period?
A: All our machines have one year guarantee, starting from the finished installation.
5.
Q: How could we do after one year warranty period?
A: We also can do service for you, but you need to pay the salary for my technician 100USD/day.
6.
Q: How could we do if the parts are broken within the warranty?
A: We would express the free replacement parts during the warranty date.
7.
Q: Does your engineer understand English?
A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience.
8.
Q: How many workers do we need to run those machines?
A: Usually need one person to operate the machine.
9.
Q: How do we solve the machine problem after your engineer leaves?
A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description.
10.
Q: How can I visit your company?
A: It takes 30 minutes by train from Shanghai to our factory.