High Speed Disposable Garbage Trash Rubbish Plastic Bags on Roll Making Machine PE PP Rolling Bag Making Machine
Basic Info
Model NO. | GR-LJD-400V2 |
Speed | High |
Continuous-Rolled | Yes |
Sealing & Cutting | Heat-Sealing Cold-Cutting |
Layer | Double |
Machine Type | Cutting Machine |
Computerized | Computerized |
Type | Plastic Bag Making Machine |
Transport Package | Pallet&Wooden Case |
Specification | CE. ISO9001 |
Trademark | GUORAN |
Origin | China |
HS Code | 8441200000 |
Production Capacity | 100 Set/Month |
Product Description
Supermarket Special Food Preservation Plastic Bag Hand Tear Point Break Continuous Roll Bag Making Machine
Product Description
Double lines garbage bag making machine is for making rolling garbage bags in efficient production by automatically changing plastic rolls. The rewinder rolls are tight and in order. Sealing type can be Star sealing or Flat sealing. And it uses heat sealing and heat cutting, it also suits for printing and non-printing bag making. The materials for making bag can be HDPE, LDPE, LLDPE, PLA or any other biodegradable materials.
Detailed Photos
Product Parameters
GR-LJD-500V2 Plastic Bottom Sealing bag-on-roll making machine is special design for 2 line high speed bag production . 2 independent computers control design and driven by 4.4 kw servo motor , high efficiency, easy and stable operation, low noise, non-stop working. Suitable for producing disposable plastic bags.
TECHNICAL PARAMETER | |
Model | GR-LJD-400V2 |
Bag Width | 250-400 mm |
Bag Length | 150-750mm |
Film thickness | 45-95micron per layer |
Speed of Die-cut Bags | 150-250pcs/min*2 |
Unwinder Film Size | 1500mm x Φ600mm |
Total Power | 16 KW |
Air consumption | 5HP |
Machine Weight | 4600KG |
Machine Dimension | 7700x1700x2500mm |
Feature and structure |
1. Main control panel adopt touch screen Delta from Taiwan, high definition2. The drive system of whole machine adopts PLC Microcomputer control (Single Chip control system ) on punch machine which integrate control of bag making part and punching part.3. Set all function with one touch screen, simple and easy operation.4. Machine will automatically stopped if film jammed which is detected by sensor5. Independent winder part, high efficient unwind control; max diameter of single unwinding is 800mm; unwinding roller is choked by air shaft,6. Automatic fold function and put on conveyor unit by unit.7. Automatic stacks the bag and collects.8. When the bags stack at the Set numerical, mechanical hands will automatically grab bags and machine will not stop.) on punch machine which integrate control of bag making part and punching part. |
Fee d structur
Certifications
Packaging & Shipping
Company Profile
Company Brief Introduction |
We were founded in 1997 (Formerly known as Guoran plastic packaging machinery factory). For more than 21 years, we focus on researching, developing, manufacturing and marketing on plastic bag making machine. Our products include :1.Film blowing Machine 2.Plastic T-shirt Bag Making Machine3.Vegetable Bag on Roll Making Machine With Core4.Flexo Printing Machine 5.Film Slitting Machine There are more than 54 countries and regions cooperating with us, such as south Korea,Turkey, Malaysia, Russia,Iran, Ethiopia, Chile, Saudi Arabia, Peru, Algeria,Vietnam,Columiba,etc. |
After Sales Service
The condition of machine operating |
A. illumination no exceed 3000LXB. altitude no exceed 1000mC. The temperature of stuff around the machine should be no higher than+40ºC and no lower than -20ºC.D. The relative humidity of air no exceeds 85%.E. The place should no have conductive dust.F. Circumstance of no blast danger and fire. |
FAQ
FAQ |
1 Q: How long will your engineer reach our factory? A: Within 7-15 days after machine arrival your factory. |
2. Q: How many days will you finish installing ? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa , round trip tickets, accommandation, and also their salary 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machine have one year guarantee, starting from finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need pay salary for my technician 100USD/day. |
6. Q: How could we do if the parts broken within warranty? A:We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A:Our engineer understand a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many worker do we need running those machines? A: Usually need one person to opertate the machine. |
9. Q: How do we solve the machine problem after your engineer leaving? A: Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according your description. |
10. Q: How can I visit your company? A : It takes 50 minutes by car from Wenzhou Air Port to our factory . And it takes only 10 minutes by car from Ruian train station to High Sea factory . |